| No | Client / Owner | Project Location | Job Description | Working Period | Remarks |
|---|---|---|---|---|---|
| 1 | PT. Gemala Kempa Daya | Pulogadung - Jakarta | Installation of CNC Machining line 8 units | Aug '90 | Okuma |
| 2 | PT. Indosteel Multi Jaya | Kapfenberg - Austria | Relocation 1 unit Rolling Mill Plant, Packing and Shipping Arrangement | Jan '90 - Nov '90 | Volume App. 3000 Tons |
| 3 | PT. Murinda Iron Steel | Mannheim - Germany | Relocation of Workshop Machinery ( Borring, Lathe, Milling, Cutting, etc) | Aug '92 - Sept '92 | |
| 4 | PT. Extrupack | Sarreguimenes - France | Relocation of Copy Milling M/C, Shearing M/C, Borring M/C,CNC Lathe | Oct '93 - Nov '93 | |
| 5 | PT. Hitachi Construction ( HCMI ) | Rawa Pasung - Bekasi | Trial Assembly of Filter House for CCPP Turbine PLN Tanjung Priok | Jul '93 - Aug '93 | |
| 6 | PT. Jakarta Prima Crane | Gunung Putri - Bogor | Installation 50T Gantri Crane 40M Span, 5 ~ 20T OHTC | Sept '93 - Oct '93 | |
| 7 | PT. Murinda Iron Steel | Kemayoran - Jakarta | Lighting Installation for Jakarta Fair Ground | Apr '93 - May '93 | |
| 8 | PT. Extrupack | Jababeka - Cikarang | Installation for Aluminium Tube Machineries, including Electric and Piping Works | Nov '93 - Dec '93 | |
| 9 | PT. Indofuji Energi | PT. Krakatau Steel Cilegon | Installation of Sizing Press Machine ( IHI ) 12.500 Cap | Jan '94 - Feb '94 | |
| 10 | PT. Astra Daihatsu Motor | Sunter - Jakarta | Installation of Grinding Machine | April '94 - May '94 | Saud Grinding M/C |
| 11 | PT. Taikisha Engineering |
MIE - Karawang EJIP - Cikarang |
- Piping Works of compressed Air for PT.NIKAWATEX Textile Plant - Installation of Waste Water Treatment Plant for PT. Sanyo ESCOM |
Jun '94 - Sep '94 Oct '94 - Dec '94 |
|
| 12 | PT. HItachi Construction ( HCMI ) | Cibitung - Bekasi | Relocation of Workshop Machineries (Lathe,CNC,Borring,Milling,Drilling M/C) | Jan '95 - Feb '95 | Okuma, Mazak |
| 13 | PT. Astra Daihatsu Motor | Sunter - Jakarta | Setting 1 unit CNC Machine PF - 5 UAB | Feb '95 | |
| 14 | PT. Murinda Iron Steel | Rawa Pasung - Bekasi | Setting Vertical Drill Machine Wetzell | Mar '95 | |
| 15 | PT. Mulia Glass | Jababeka - Cikarang | Setting 4x500 kVA Caterpillar Generator , Wirring Cable for 6,4 kVA & 20 kVA, High voltage test and Panel Setting | Apr '95 - Jun '95 | |
| 16 | PT. Tubalex Indah | Jababeka - Cikarang | Installation of Workskop Machineries (Milling, Drilling,Groving,CNC,Lathe, etc) | Jul '95 - Sep '95 | Okuma, Mazak, etc |
| 17 | PT. Nusa Toyotetsu Corp. | MM2100 - Cibitung |
- Relocation Works of Press Machines for Stamping Plant - unloading + settings 300 Tons AIDA Press Machine |
Jan '96 - Mar '96 |
110 Tons - 500 Tons Cap |
| 18 | PT. Sugity Creatives | MM2100 - Cibitung | Installation of Injection Moulding Machine and Accessorie | Feb '96 - Apr '96 | 180 Tons - 2500 Tons Cap. |
| 19 | PT. Nippon Denso | MM2100 - Cibitung | Supplied and Installed 1 unit Waste Water Treatment Plant | Mar '96 - Jun'96 | |
| 20 | PT. Aisin Indonesia | EJIP - Cikarang | Installation of Heat Treatment and Machining Line ( CNC, Grinding, Borring and Cutting ) | May '96 - Jul '96 | |
| 21 | PT. Toyota Tsusho Corp. | Cibitung - Bekasi | Installation of Mitsubishi 1300 Tons of Injection Molding Machine at PT.HYMOLD Indonesia | Oct '96 - Dec '96 | 4 units |
| 22 | PT. Kuritec Indonesia | KIIC - Karawang |
- Installation of WWTP for Ogawa Project - Installation of Segawe and Water Treatment Plant for KIIC Industrial Estate |
Oct '96 - Nov '96 Sep '96 - Dec '96 |
|
| 23 | PT. Koyojaya Indonesia | Cibitung - Bekasi | Pit Covering and Installation Works for 200 Tons Press Machine, Panel Setting, Wiring and Connecting | Nov '96 - Dec '96 | |
| 24 |
PT. Solar Turbines - International Singapore |
Karawang |
- Fabrication and Installation Works of Stainless Stell Ducting Turbine for KIA Project - Fabrication and Installation Works of Ducting for Cahaya Putera Project |
Jan '97 - May '97 Mar '97 - Apr '97 |
|
| 25 | PT. Toyota Tsusho Corp. | Cikarang - Bekasi | Installation of Machineries and Utility for Takagi Plant ( Press MC and Machining ) | Jan '97 - June '97 | Mazak |
| 26 | PT. Yakult Indonesia Persada | Sukabumi - West Java | Installation and Relocation of Machineries from previous Factory in Cibubur to the New Factory in Sukabumi | Jan '97 - June '97 | |
| 27 | PT. Maspion | Surabaya - East Java | Installation of Chinfong Press Machine 200 Tons | Mar '97 | |
| 28 | PT. Aisin Takaoka | Karawang |
- Relocation of Casting Plant Machining Line from previous Factor ( Kelapa Gading ) to the new Factory in Karawang - Installation of Roll Forming Machineries Jigs - Inland Transportation and Instalaltion of Machining Line |
Mar '97 - Jun '97 Apr '97 Apr '97 |
Machining Line
|
| 29 | PT. Kuritec Indonesia | Cikarang - Bekasi |
- Modification and Installation of Wiring Panel and Pump H2SO4 at PT. Toshumit - Module Fabrication and Assembling Works for Contact Airation Tank of Sewage Treatment Plant for KIIC Project - Installation Works Renewal Solencide Valve Box and Electrical Works at ITS Project |
Mar '97 Mar '97 Sep '97 - Oct '97 |
|
| 30 | PT. Nusa Toyotetsu Corp | MM2100 - Cibitung | Installation / Erection of 2 Units FUKUI Press Machine @500 Tons capacity | Mar '97 - Apr '97 | |
| 31 | PT. TIX Indonesia | Cibitung - Bekasi | Installation of CNC Lathe, Borring, Grinding Heat Treatment | Apr '97 | Mazak |
| 32 | PT. Indoturbine Indonesia | Surabaya - east Java | Design, Manufacturing, Inspection, Testing, Preparation for Shipment and Delivery of 2 Exhaust Ducting at ARII Marunda Warehouse | May '97 - Jun '97 | |
| 33 | PT. Sugity Creatives | Cibitung - Bekasi | Installation of Workshop Machineries and Electrical Works | Jun '97 | |
| 34 | PT. Ryowa Binatek Pratama | Cibitung - Bekasi | Installation of Roll Forming Machine | Aug '97 - Oct '97 | |
| 35 | PT. Horiguchi Engineering | Karawang | Removing 1 unit Press Machine from Ochiai to Horiguchi V.V | Aug '97 | |
| 36 | PT. Sakura Jaya Indonesia | Cikarang - Bekasi | Custom Clearance, Inland Transportation and Installation, Air Piping and Electrical Works | Sep '97 | |
| 37 | PT. KICI | Bukit Indah City - Purwakarta | Installation of Moulding Machine, Electrical Works, Piping Works at PT. KICI | Sep '97 - Oct '97 | |
| 38 | PT. Solar Turbine International Singapore | Karawang | Fabrication and Installation Works of Ducting for KIA Project ( Ceramic Tile Factory ) | Oct '97 | |
| 39 | PT. Asahimas Flat Glass | Ancol - Purwakarta | Dismantling and Re-Installation of 2 Line of Glass Bending Machine from Asahimas Ancol moved PT. Asahimas Purwakarta | Oct '97 - Dec '97 | |
| 40 | PT. Timor Putra Nasional | Cikampek | Installation of 1000 Tons Press Line (1000 Tons x 1, 800 Tons x 1, 600 Tons x 2 ) | Jan '98 - Apr '98 | |
| 41 | PT. OKA International Log | Cibitung - Bekasi | Setting Press Machine AIDA PMX300 -215-100 and Cold Line | April 1999 - May '99 | |
| 42 | PT. Asahimas Flat Glass | Cikampek | Relocation of Bending Machine Process JL-C-II | May '99 - Jun '99 | |
| 43 | PT. Inti Panca Press Industri | Pondok Ungu - Bekasi | Installation of 2000 Tons Press Automation Line Maker = AIDA | Jan '00 - May '00 | 2000 Tons X 1, 1000 Tons x 1, 600 Tons x 2 |
| 44 | PT. Sugity Creatives | Cibitung - Bekasi | Installation of 2500 Tons Injection Moulding Machine | Feb '00 - Mar '00 | |
| 45 | PT. Jayantara Setia Sejahtera | Tangerang | Installation of Rubber Seal Plant Heater | May '00 | |
| 46 | PT. Timor Putra Nasional | Cikampek | Installation of Die Casting Machine for KIA Automotive Industry and 500 Tons Press M/C | May '00 | |
| 47 | PT. Timor Putra Nasional | Cikampek | Installation of Cylinder Head and Cylinder Blok Line Machineries (CNC, Washing,etc) | Sep '00 - Dec '00 | Hecket GmbH - Germany |
| 48 | PT. Mulia Glass | Cikarang | Installation of Flood - 1 Cold End Equipment Furnace Equipment Re- Built Works | Sep '00 - Dec '00 | |
| 49 | PT. Aisin Indonesia | Cikarang | Installation of New Heat Treatment and 500 Tons of Press Machine | Jan '01 - Feb '01 | |
| 50 | PT. Sugity Creatives | Cibitung - Bekasi | Installation of Rubber Line Machineries, Relocation of 1300 Tons Injection etc. | Jul '01 - Sep '01 | |
| 51 | PT. MTM | Jababeka - Cikarang | Installation of Forging Press M/C 850 Tons capacity | May '01 - Jun '01 | |
| 52 | PT. Pirelli Cables Indonesia | BIC - Cikampek | Recondition and Installation of 2 units Screening Machine, including Foundation | Sep '01 - Dec '01 | |
| 53 | PT. Stanley Indonesia | Cikupa - Banten | Installation of 5 units Injection Moulding M/C 180 Tons - 850 Tons capacity | Mar '02 - Apr '02 | |
| 54 | PT. Intipolymetal |
Osaka - Japan Cikarang - Pulogadung |
Dismantling, Re- Installation of 7 units press machine capacity 300 - 350 Tons ( Aida, Hitachi, Fukui ) |
Apr '02 - May '02 Jun '02 - Oct '02 |
for Dismantling for Installation |
| 55 | PT. Pirelli Cable Indonesia | Bukit Indah City - Cikampek | Supply and Installation of Troester Extruder | Jan '03 - Feb '03 | |
| 56 | PT. Essar Dananjaya | MM2100 - Cibitung | Erection of 2500 Mill Housing Press Machine | Feb '03 | |
| 57 | PT. Tsuzuki Hazama | Surya Cipta Industrial Estate - Karawang | Installation of 8 units CNC Lathe Machine |
Mar '03 |
|
| 58 | PT. Aisin Indonesia | EJIP - Cikarang |
- Supply and Installation, Load / Unloading Deck, Relocation Die Shop etc. - Relocation of Heat Treatment, Piping, Ducting - Setting 260 Tons Injection Moulding Machine |
Mar '03 Jun '03 - Jul '03 Oct '03 - Nov '03 |
|
| 59 | PT. Indoporlen | Tambun - Bekasi |
- Installation of Brick Press 500 Tons - Relocation of 1 unit Melting Furnace |
Mar '03 Dec '04 |
|
| 60 | PT. Yamaha Music | MM2100 - Cibitung | Changing 850 Tons Clamp unit Injection Moulding M/C | Feb '03 | |
| 61 | PT. MGBI ( Battery Plant ) | Cibitung - Bekasi | Installation of R.20 Body Maker Line Machineries and Tandem | Apr '03 | |
| 62 | PT. Kaneta ( Automotive Parts Manufacturer ) | EJIP - Cikarang | Installation of Machining Line ( CNC,Lathe,Borring and Grinding M/C) | Apr '03 - May '03 | Mori Seiki |
| 63 | PT. Multi Power - Semarang | PT. IPPI - Bekasi | Dismantling 800 Tons and 400 Tons Verson Press Machineries | May '03 | |
| 64 | PT. Padma Soode Indonesia | Bantar Gebang - Bekasi | Relocation of Machineries from Jababeka to Cileungsi ( Press, Washing MC, etc ) | Jun '03 | |
| 65 | PT. Sugity Creatives | MM2100 - Cibitung |
- Relocation Injection Moulding Line 1300 Tons, Piping and Electrical Works - Installation of 3500 Tons Injection Moulding Machine - Installation of 2500 Tons Injection Moulding Machine - Installation of 1050 Tons Injection Moulding Machine - Relocation of 1600 Tons moulding machine from factory Ii to factory III |
Jun '03
Jan '04 May '04 Aug '04 |
1 Factory |
| 66 | PT. Inti Pantja Press Industri | Pondok Ungu - Bekasi | Set up die spotting press machine | Jun '03 | |
| 67 | PT. Intipoly Metal | Pulo Gadung - Jakarta | Recondition of Press Machine | Jun '03 - Oct '03 | |
| 68 | PT. Honda Prospect Motor ( Automotive Manufacturer ) | Mitra Industrial Estate - Karawang |
- Supply and Install 10 Tons Overhead Travelling Crane - Supply and Install 2 sets scrap Chute of press line - Erection of 1500 Tons press machine Fukui - Relocation Machining Line |
Jun '03 - Oct '03 Feb '04 |
|
| 69 | PT. Amerta Indah Otsuka | Cicurug - Sukabumi | Installation of pocari sweat factory machineries ( Seamer,Filter,Rinser,Tank and Conveyors System ) | Sep '03 - Nov '03 | |
| 70 | PT. Indo Matsumoto | Cibitung | Setting of 250 Tons TAMADA Press Machine | May 2004 | |
| 71 | PT. Aisin Indonesia | EJIP - Cikarang |
- Relocation of 8 units press machine (rolling, electrical setting and air piping -> Line Stamping) - Relocation of 4 units press machine - Relocation of 7 units Stamping Machine - Relocation of Stamping Press Machine Line include Electrical and Air Piping - Installation of 500 Tons Press Machine AIDA and other machineries - Relocation Injection Machine and intake manifold to the new factory - Relocation D/L Line, Electrical and Piping Works |
Apr '04 May '04 May '04 Jun '04 Jul '04 Jul '04 Jul '04 |
|
| 72 | PT. Timor Putra Nasional | Dauan - Cikampek | Installation of 2000 Tons S/A Press Line (2300 Tons x1,1000 Tonsx2, 800 Tonsx2) WIA | Jun '04 - Oct '04 | |
| 73 | PT. Pirelli Cables Indonesia | Indotaisei - Cikampek |
- Installation of screeening line & construction of pit foundation - Installation of Screening Wire Line - Installation platform for screening machine |
Oct '04 Oct' 04 - Feb '05 Feb '05 |
|
| 74 | PT. Asalta Mandiri Agung | Nanggewer - Bogor | Relocation of 6 unit press machines | Sep '04 - Nov '04 | |
| 75 | PT. Amerta Indah Otsuka | Lawang - Surabaya |
- Shifting of Canning Machineries to Temporary Storage area,prior transportation to Sukabumi - Relocation of Machineries from Lawang to Sukabumi |
Nov '04 Mar '05 - Jun '05 |
Dismantling & Re-Installlation
|
| 76 | PT. Nusa Toyotetsu Corp | Cibitung - Bekasi |
- unloading + Setting of 200 Tons AIDA Press Machine - unloading + setting of 200 Tons AIDA Press Machine |
Jan '05 Dec '05 - Jan '06 |
|
| 77 | PT. Aisin Indonesia | EJIP - Cikarang |
- Unloading + Setting of 280 Tons Injection Machine include electrical + piping work - Setting door lock machineries include Electrical and piping work |
Jan '05 Jan '05 |
|
| 78 | PT. Menara Terus Makmur | Cikarang - Bekasi |
- Installation of Machine Press Jingduan FP 1600 - Recondition of Forging Machine |
Mar '05 Aug '05 |
|
| 79 | PT. Aisin Indonesia | EJIP - Cikarang |
- Installation of Water Piping Line for 650 Tons Injection Machine - Unloading + settings 650 Tons Injection Machine - Relay out door lock line including piping and electrical works - Relay out 2 D.00 and 510 Door Framelines incl. Piping & electrical works - Relay out CC-CD line incl.piping and electrical works |
Apr '05 Apr '05 - May'05 Jul '05 Sep '05 Oct '05 |
|
| 80 | PT. Rolitrans | Narogong - Bekasi | Packing work for PT.Concrete Reinforcement Asia | May '05 | |
| 81 | PT. Okamoto International Logistics | Cibitung - Bekasi |
- Unloading, Unpacking & Setting 1 Set of Production Machine - Setting x-ray machine at Soekarno Hatta International Airport - Setting x-ray machine at Polonia Airport, Medan |
Jun '05 Sep '05 Sep '05 |
|
| 82 | PT. Graha Cemerlang Paper | Cikampek | Yanke Dryer Erection | Jun '05 - Jul '05 | |
| 83 | PT. Nissin Transport Indonesia | Cibitung - Bekasi | Relay out machineries at PT. Kaneta | Jun '05 | |
| 84 | PT. AIDA Stamping PTE Ltd. | EJIP - Cikarang |
- Dismantling of crown + slide of press machine at PT. Sanyo EJIP - Loading of crown + slide at KIIC transported to PT. Sanyo EJIP |
Oct '05 Oct '05 |
|
| 85 | PT. Sugity Creatives | Cibitung |
- Setting machine for new PVC Line - Relocation of PVC Extrusion 1 + PVC Extrusion 2 + PVC Finishing Line |
Jan '06 Jan '06 |
|
| 86 | PT. Jayantara Setia Sejahtera | Karawang | - unloading & setting blowmoulding machine at PT. Kyoraku Blowmoulding Indonesia | Jan '06 | |
| 87 | PT. Okamoto Logistic Nusantara | Kalimantan Barat | Delivery health instrument to each kabupaten in west kalimantan | Jan '06 - Feb '06 | |
| 88 | PT. HCMI | Cibitung | Installation of 60 Tons Positioner | Feb '06 | |
| 89 | PT. Abadi Barindo Autotech | Cibitung |
- Base/Sole Plate Prior Installation of 1000 Tons press machine - Installation of 1000 Tons press machine |
Feb '06 Apr '06 |
|
| 90 | PT. Aisin Indonesia | EJIP - Cikarang |
- Relay out D/L + D.F Line - Relay out intake manipole line + D/F Line incl.electrical and piping works - Relay out D/F line + diaphragm spring line + kaizen line incl.electrial & piping works - unloading + setting blasting machine incl.electrical and piping works - Relay out door lock + door frame line ( spot welding ) incl. piping & electrical works - unloading + setting machine & equipment for intake manipole (elec & piping works) - piping & electrical works of door lock line M/C - relay out sricker machine/ door lock/tempering incl.electrical + piping work - installation diaphragm machine,unloading, rolling installation |
Jan '06 Feb '06 Feb '06 Feb '06 Feb '06
Mar '06 Mar '06 Mar '06 Mar '06 |
|
| 91 | PT. Menara Terus Makmur | Jababeka - Cikarang | Replacement Hammer Otani FG with Nithan N500 P | Apr '06 | |
| 92 | PT. Gemala Kempa Daya | Pulogadung - Jakarta | Installation the foundation for AIDA SMX-S4-10000 Press Machine foundation |
Jul '06 - Oct '06 |
|
| 93 | PT. AIDA Stamping Technology | USC - Karawang | Installation of AIDA PMX S4-8000 + Feeder | Jul '06 - Aug '06 | |
| 94 | PT. Mekar Armada Jaya | Tambun - Bekasi |
- Installation of 400 Tons KOMATSU Press Machine ( 1 line : 3 units ) - Installation of 800 Tons KOMATSU Press Machine ( 1 unit ) |
Aug '06 - Sep '06 Sep '06 |
|
| 95 | PT. Komatsu Marketing Support | Tambun - Bekasi | Rigging & Install of KOMATSU Press Machine E2G400 ( 3 units ) at PT. Mekar New Armada | Aug '06 - Sep '06 | |
| 96 | PT. Balacipta Yudha M | Karang Ampel - Karawang | Machinery assembly at PT. Ceres Meiji Indotama Karawang | Nov '06 | |
| 97 | PT. Amerta Indah Otsuka | Cicurug - Sukabumi | Dismantling Machinery and Tools | Dec '06 | |
| 98 | PT. Seksun Precision Eng. | MM2100 - Cibitung | Relay out works 10 units and installation PATEC Machine type FGL450 ( 1 unit ) | Jan '07 | |
| 99 | PT. Rinnai Indonesia | Cikupa - Tangerang | Foundation of 250 Tons AIDA Press Machine incl.handling,moving,stand up and installation | Jan '07 - Feb '07 | |
| 100 | PT. Gemala Kempa Daya | Pulogadung - Jakarta |
- Installation of 1000 Tons AIDA Press Machine - Pit cover elevation 2485 and Platform panel |
Feb '07 Mar '07 |
|
| 101 | PT. Asalta Mandiri Agung | Nanggewer - Bogor |
- Off-loading,installation of 100 Tons Nagao and 150 Tons Wasino - Installation of 150 Tons, 250 Tons and 350 Tons capacity AIDA Press Machine |
Feb '07 Apr '07 |
|
| 102 | PT. Amerta Indah Otsuka | Cicurug - Sukabumi | Dismantling & Installation | Mar '07 - May '07 | |
| 103 | PT. Padma Soode Indonesia | Bantar Gebang - Bekasi | Re- lay out and relocation work SSP - PSI | Mar '07 - Apr '07 | |
| 104 | PT. IGI Center | Cikarang - Bekasi | Relocation Work SSP - PSI - ATMI | Mar '07 - Apr '07 | |
| 105 | PT. Toyota Tsusho Mechanical | Cikarang - Bekasi | JSW 1300 Injection Moulding Assembly at PT.Denso Indonesia | Mar '07 | |
| 106 | PT. Trimitra Marganda | Bantar Gebang - Cikiwul | Installation of 500 Tons press machine at PT. Metindo Era Sakti Bantar Gebang | Mar '07 | |
| 107 | PT. Kindai Technology | Cikarang - Bekasi | Unloading, unpacking and installation of 160 Tons AIDA Machine | Apr '07 | |
| 108 | PT. Ohsung Electronics | Cibitung - Bekasi | Installation of 400 Tons HIW Press Machine | Apr '07 | |
| 109 | PT. TTME |
Cikarang - Bekasi ADM - Sunter ADM - Sunter ADM - Sunter ADM - Sunter |
- JSW 1300 Injection Moulding Assembly at PT. Denso Indonesia - Relocation Works ADM Stamping Taruna & Zebra Welding Gantry - Installation of Cooling Tower Supply at PT. ADM - Sunter - Installation of 1x1000 Tons & 3x600 Tons KOMATSU Servo Press Machine - Stamping Works for Taruna & Zebra Welding Gantry |
Jun '07 Jul '07 Aug '07 Aug '07 Nov '07 |
|
| 110 | PT. Mitsuba Indonesia | Jatiuwung - Tangerang |
- Installation of 250 Tons AIDA Press Machine - Relay out works press machine incl.Unloading,Setting,Leveling of new 80 Tons AIDA Press Machine - Installation and Furnace UBE - FE400 |
Jun '07 Jul '07 Sep '07 |
|
| 111 | PT. Amerta Indah Otsuka | Cicurug - Sukabumi |
- Dismantling and Installation Works Conveyor, Blow Moulding - Additional Work ( Installation of Air Conveyor, Sprider Blow Moulding, Drainage Modif, HWT & Alkali Tank, Boiler, Spray Cooler modification and Installation of Blowdown Tank, Gasoline Tank ) |
May '07 - Jun '07 Aug '07
|
|
| 112 | PT. Panasonic Gobel Battery Indonesia | MM2100 - Cibitung | Unloading and Haulage of Honney Dry Machine | Jul '07 | |
| 113 | PT. ALTECH Indonesia | Cicurug - Sukabumi |
- Unloading & Unpacking Injection Moulding + Accessories Assembly ( 2 Shipment) - Unloading, Positioning, Installing Dryer,Chiller, Air Conditioner & Accessories - Unloading, unpacking Generator + Accessories - Installation of Injection Moulding Machine with Accessories |
Jul '07 Jul '07 Jul '07 Nov '07 - Dec '07 |
|
| 114 | PT. Shibaura Shearing Indonesia | MM2100 - Cibitung |
- Manpower supply for installation NC GAS 6 Machine - Manpower supply for installation of 2 Plasma Machine - Manpower supply for installation NC GAS 3,4 |
Jul '07 Aug '07 Aug '07 |
|
| 115 | PT. PGBI | Cibitung - Bekasi | Unloading, unpacking HR Assy | Aug '07 | |
| 116 | PT. AIDA Stamping Technology | MM2100 - Cibitung |
- Shifting In and Out of 200 Tons AIDA - Leveling 150 Tons AIDA at PT. Namicoh Plant - Repairation of 150 Tons AIDA Press Machine at PT. Takitha Cikarang - Overhaule of 150 Tons AIDA Press Machine at PT. Yutaka Cikarang - Overhaule of AIDA-NCI 200 at PT. Kyosha - Offloading , Rolling, Unpacking,Setting & Leveling of 1 unit AIDA NC-2000 E Press Machine + Uncoiller at Kemayoran |
Sep '07 Sep '07 Sep '07 Oct ' 07 Dec '07 Dec '07 |
|
| 117 | PT. Abadi Barindo Autotech | MM2100 - Cibitung | Dismantling of 600 Tons Machine incl.packing,delivering to Tanjung Priok + FOB | Sep '07 | |
| 118 | PT. PGBI | Kawasan Gobel - Cibitung | Equipment relocation Soeks at PGBI Plant | Sep '07 | |
| 119 | PT. Seksun Presisi Eng. | Kawasan Lippo - Cikarang | Installation of 300 Tons PATEC Press Machine | Sep '07 | |
| 120 | PT. Padma Soode Indonesia | Bantar Gebang - Bekasi |
- Relocation of 30 Tons AIDA Press Machine - Relay out equipment maintenance & die shop area |
Oct '07 Dec '07 |
|
| 121 | PT. Hitachi Construction Machinery Indonesia | Cibitung - Bekasi |
- Installation of Radial Drilling Machine |
Nov '07 | |
| 122 | PT. Dunia Express | Cikampek | Relocation of 4WD Assembly L/O at HPPM Cikampek | Nov '07 | |
| 123 | PT. Astra Daihatsu Motor | Sunter - Jakarta |
- Water Curtain With Green Net 35 Unit - Modification of Safety Fence Line 5A, Lamp Cover & Panel - Modifiication of Panel Moving and Conveyor - Dismantling, Installation of PVC Sheet Coverline, Fab. & Installation of Cover Support Shuttler Door Moving Bolster , Modification of Destack Feeder - Overhaule of 400 Tons KOMATSU 3B Press Machine & Cleaning of Machine Parts - Modification and Reparation Shutter Door M/B 4A1 - 4A4 - Replacement of Cover AIDA press machine , dismantling shutter panel control & repair scrap chutte assy - Repair of shutter Door M/B & dismantling of die clamping AT2P - Green Net Line 4A, Mezzanine Plastic Cover Line, Green Net Door Operator Panel & Inspection Table Line - Inspection Lighting for 4A Line ( 3 Lots ) - Fabrication and Installation of Piping Bracket ED Tank - Relocation and Modification of Lorry at PT. ADM - Press Machine & press machine roof cleaning, dismantling & reinstallation of plastic cover line - Installation of Plastic Cover AIDA Press Machine 4A-1 - Modification Piping of Die Cushion 4A - 2 - Installation of Plastic Cover 5A1,5A2,4A4,4A2
|
Jan '08 Jan '08 Jan '08 Jan '08 Jan '08
Jan '08 Jan '08 Jan '08 Jan '08 Jan '08 Mar '08 Apr '08 Apr '08 Aug '08 Aug '08 Aug '08 |
|
| 124 | PT. Sanden Indonesia | Karawang | Leveling of CNC Machine | Jan '08 | |
| 125 | PT. AIDA Stamping Tech Indonesia | MM2100 - Cibitung |
- Overhaule at PT. Mugai - Karawang - Leveling Feeder at PT. USC - Overhaule AIDA NCI - 200 at PT. Kiyokuni - Alignment and Set up parts at PT. USC - Leveling 1 unit AIDA NC2-200 at PT. Amtek - Leveling press machine and feeder at PT. Amtek - Overhaule 110 Tons AIDA Machine at PT. Standard Indonesia - Servo Motor + Cables Replacement for PT. IPPI Job - Dispatch manpower for PT. ADM - Installation &Fabrication Safety Fence at PT. Yamaha - Overhaule AIDA Press Machine at PT. Sanyo Cikarang - Overhaule AIDA Press Machine at PT. FCC karawang - Overhaule AIDA Press Machine at PT. Sanyo |
Jan '08 Feb '08 Mar '08 Apr '08 May '08 May '08 Jun '08 Oct '08 Oct '08 Oct '08 Nov '08 Nov '08 Dec '08 |
|
| 126 | PT. Toyota Tsusho Mechanical Engineering Service Indonesia | MM2100 - Cibitung |
- Partition wall (30 x 4 m ) at PT. Astra Daihatsu Motor - Piping works at PT. Astra Daihatsu Motor - Reparation of Komatsu Press Machine at 5A Line in ADM Stamping Plant - Overhaule of Servo Motor at PT. ADM |
Jan '08 Jan '08 Apr '08 Oct '08 |
|
| 127 | PT. Seksun Presisi Eng. | Cikarang | Relocation of 300 Tons PATEC press machine ( 2 units ) | Feb '08 | |
| 128 | PT. Panasonic Gobel Battery Indonesia | Cibitung |
- Relay Out UM-(MIP) & UM- 2 Machines - Relocation of hooper and conveyor MIX - UM2 - Relay out manganese div.hooper and mix conveyor - Unloading, unpacking setting and installation works for Polland Machine ( 16 Container 40 feet) - Investment / Relay Out Metal Jacket & Blister Checker |
Jan '08 - Feb '08 Feb '08 Feb '08 Apr '08 Oct '08 |
|
| 129 | PT. Okamoto Logistics Nusantara | Jakarta |
- Trucking, Unloading, Moving and Setting ( Leveling ) at PT. Komoda Indonesia - Trucking Supply from Tanjung Priok to EJIP - Cikarang - Manpower & Utilization Tools at PT. Precious Indonesia - Karawang - Wooden Block for Rolling machine & steel support for form at PT. Komoda - Installation of former machine and accessories at PT. Komoda Cikarang - unpacking, rolling works, setting and leveling of new machine at PT. KICI Cikampek - Utilization of 20 Tons Hydraulic Crane for Machine ex Japan at PT. KICI Cikampek - Chiller Water Piping & Compresor Piping for Machine ex. Japan at PT. KICI Cikampek - Piping Drain for Chiller Machine & Backing Machine at PT. KICI Cikampek - Electrical Manpower Supply for Temporary Wiring at PT. KICI Cikampek - Assembly Hoist Crane for Machine ex. Japan in PT. KICI Cikampek - Utility Works of 110 Tons AIDA Press Machine at PT. Umeda Kogyo - Unloading, Rolling, Setting, Leveling of 25 Tons Komatsu Press Machine ( 2 units ) - Electrical Works in PT. Umeda Kogyo |
Mar '08 Mar '08 Apr '08 Apr '08 May '08 Jun '08 Jun '08 Jun '08 Jul '08 Jul '08 Jul '08 Aug '08 Dec '08 Dec '08 |
|
| 130 | PT. Chandra Anugerah Cipta | Cikarang | Installation of AIDA NC 2-2500 (2 units) E (1 unit ) at Cikarang | Mar '08 | |
| 131 | PT. Mitsuba Indonesia | Jatiuwung - Tangerang |
- Relay out works of 16 units Press Machine - Relocation works of fly wheel machineries |
Apr '08 Apr '08 |
|
| 132 | PT. Yutaka Manufacturing Indonesia | MM2100 - Cibitung | Moving 150 Tons Press Machine | Apr '08 | |
| 133 | PT. Padma Soode Indonesia | Bantar Gebang - Bekasi |
- Relocation and Relay out stamping division - Installation and Relocation of Machinery in Padma Soode Plant |
Apr '08 Jul '08 |
|
| 134 | PT. Kurita Indonesia | Cicurug - Sukabumi | Relocation works of RO Product Tank (SUS 304 ) | May '08 | |
| 135 | PT. Amerta Indah Otsuka | Cicurug - Sukabumi |
- Installation works of Equipment - Preparation of seamer bearing replacement - Working Progress on equipment installation - Installation works of Equipment - Gantry Utilization for Pocari Plant |
May '08 May '08 Aug '08 Sep '08 Nov '08 |
|
| 136 | PT. Shibaura Shearing Indonesia | MM210 - Cibitung |
Manpower supply Manpower supply |
May '08 Jun '08 |
|
| 137 | PT. Gemilang Roxy | EJIP - Cikarang | Installation of Denyo Genset (Trucking,Unloading,Unpacking,Haulage, Rolling,Setting,Leveling at PT. TS-Tech Cikarang | Jun '08 | |
| 138 | PT. Arsicon Harza International |
Yogyakarta Rungkut - Surabaya Cikiwul - Bantar Gebang |
- Manpower supply of leveling 600 Tons Lien Chieh Machine - Dismantling & Reinstallation of 1350 Tons & 630 Tons SMG Press Machine ( 2 units ) - Installation of 800 Tons Komatsu Press Machine at PT. Metindo Era Sakti - Base Plate Adjustment for machine ex.Japan at PT.KICI Cikampek - Installation of 200 Tons Komatsu Press Machine ( 2 units ) from PT. Sharp to PT. Posmi |
Jun '08 Jul '08 Jul '08 Jul '08 Nov '08 |
|
| 139 | PT. Panasonic Gobel Battery Indonesia | Kawasan Gobel - Cibitung |
- Installation Works of Honey Dry Unit at PGBI Plant - Assembly old unit and relocation works at PGBI Plant - Unloading, Haulage, Setting & Leveling of Cake Tamping Machine |
Jul '08 Jul '08 Aug '08 |
|
| 140 | PT. Rinnai Indonesia | Cikupa - Tangerang | Trucking, Offloading, Rolling Works, Setting, Leveling of AIDA NC-2000 (2) E Press Machine | Jul '08 | |
| 141 | PT. Menara Terus Makmur | Jababeka - Cikarang |
- Installation of 650 Tons Chin Fong Press Machine - Erection Hammer Otani 1,5 Tons FG-9 - Overhaule Press Voronezh |
Aug '08 Oct '08 Nov '08 |
|
| 142 | PT. Extrupack | Rawapasung - Bekasi | Relocation of extruder machine line 6 | Oct '08 | |
| 143 | PT. Panasonic Gobel Energi Indonesia | MM2100 - Cibitung |
- Investment Tsujido Machine & Installation from truck container - Unloading, Haulage, Setting & Leveling of cake tamping machine |
Oct '08 Oct '08 |
|
| 144 | PT. Gapura Tekindo | Kawasan Gobel - Cibitung | Dismantling and Reinstallation of Drum Driver at PT.PGBI | Nov '08 | |
| 145 | PT. Altech | Sukabumi |
- Overhaule for 2 units injection moulding machine - Overhaule for 1 unit injection moulding heater machine |
Nov '08 Dec '08 |
|
| 146 | PT. AIDA Stamping Tech Indonesia | MM2100 - Cibitung |
- Custom Clearance, inland transportation, offloading and setting of AIDA NS1-2000 (S) Press Machine & Accessories in PT. ASMO Cibitung - Overhaule of 200 Tons and 600 Tons AIDA Press Machine at PT. ADM, Sunter Jakarta - Dismantling, Rolling Works, Loading & Trucking & Reinstallation of 1 unit AIDA Press Machine - Installation Transfer Feeder at PT. Padma Soode - Installation of 2 units AIDA NS2 - 2000 at PT. EPSON - Installation of 1 unit AIDA LXM Feeder Uncoiler at PT. EPSON - Relayout works of 1 unit AIDA HMX 1000 at PT. EPSON - Overhaule AIDA Press Machine at PT. FCC Karawang - Overhaule AIDA Press Machine at PT. Takita Cikarang - Overhaule 1500 Tons AIDA Press Machine at PT. ADM |
Dec '08 - Jan '09 Jan '09 Apr '09 May '09 Sep '09 Oct '09 Oct '09 Nov '09 Dec '09 Dec '09 |
|
| 147 | PT. Welltekindo Nusantara | Cikarang - Bekasi | Offloading, Rolling Work, Unpacking, Setting & Leveling of NT4250 DCG CNC Machine | Jan '09 | |
| 148 | PT. Arsicon Harza International | Cikupa - Tangerang |
- Trucking & Installation of 7 units AIDA Press machine at PT. Rinnai Indonesia - Trucking & Installation of 1 unit 400 Tons Lien Chieh Press Machine at PT. Rinnai Indonesia - Installation of LCM Press Machine 150 Tons + Accessories - Overhaule for shaft HFPQ Kojima aat PT. Yutaka Manufacturing |
Mar '09 Mar '09 Nov '09 Dec '09 |
|
| 149 | PT. Extrupack | Rawapasung - Bekasi |
- Relocation of 8 lines machineries - Relocation of of machineries from line 10 to line 8 - Reinstallation of machineries line 8 to line 10 - Relocation of machine and accessorie line 12 at PT. Extrupack - Relocation works of 4 units Container & Offloading for 2 units new container - Relocation of Racks - Relay out of machineries line 9 - Fabrication & Installation Works of 6 sets Racks - Fabrication & Installation Works of Racks - Relocation of Machine & Accessories Line 12 - Relocation of Machine Line 10 - Relocation of Machineries Line 2 - Relocation COntainer 40' - Epoxy Floor Coating 300 MCR |
Mar '09 Mar '09 Mar '09 Sep '09 Sep '09 Sep '09 Sep '09 Oct '09 Oct '09 Nov '09 Dec '09 Dec '09 Dec '09 Dec '09 |
|
| 150 | PT. Okamoto Logistics Nusantara | Cikampek |
- Cable support & Spiral Hose Setting machine at PT. KICI Cikampek - Installation of HI-Prex Press Machine & Accessories ( 1 set ) at PT. Umeda Kogyo - Relocation Works of machineries at PT. Sugity |
Mar '09 Oct '09 Oct '09 |
|
| 151 | PT. PECGI | MM2100 - Cibitung | Unloading, unpacking, rolling works, setting & leveling of R-8 and 13 cases Tamping unit | Mar '09 | |
| 152 | PT. Menara Terus Makmur | Jababeka - Cikarang |
- Overhaule press voronezh at PT. MTM ( Additional ) - Overhaule Press Jing Duan 1000 Tons FG8/FG 5 at PT. MTM Cikarang - Overhaule Press Shen Chyi SCP 110 Tons - Relay Out 2 units Shot Blasting Shinto - Erection Boring Machine |
Mar '09 May '09 Jun '09 Sep '09 Sep '09 |
|
| 153 | PT. Amerta Indah Otsuka |
Pasuruan - Jawa Timur Cicurug - Sukabumi |
- Unloading & Setting for new machineries at PT. AIO Pasuruan - Gantry Utilization |
May '09 May '09 |
|
| 154 | PT. Toyota Tsusho Mechanical Engineering Service Indonesia | Sunter - Jakarta | Balancer Cylinder overhaule at PT. ADM | Jul '09 | |
| 155 | PT. Mitsuba Indonesia | Jatiuwung - Tangerang |
- Unloading & Setting of 2 units 110 Tons AIDA Press Machine - Relocation works of 5 units press machine - Installation works of 110 Tons AIDA Press machine |
Aug '09 Aug '09 Nov '09 |
|
| 156 | PT. Tri Dharma Wisesa | Pulogadung - Jakarta |
- Relay Out Treatment & Hardening Machine 5 & 6 , Relay Out Melting Machine - Relay out Treatment & Handling machine 1 & 2 - Relay out casting line - Relay out of 2 units existing Melting Machine & Relay out works of 2 units curing machine |
Aug '09 Sep '09 Sep '09 Dec '09 - Jan '10 |
|
| 157 | PT. Otsuka Indonesia | Lawang - Jawa Timur | Relocation of 1 unit Tank and 1 unit Distiller | Sep '09 - Oct '09 | |
| 158 | PT. Lima Tekno Indonesia | Karawang | Leveling of Grinding Machine at PT. Lima Tekno Indonesia | Dec '09 | |
| 159 | PT. NYK New Wave Logistics Indonesia | Tambun - Bekasi | Base dismantling jacking, rolling , setting and leveling at PT. Cabinindo Tambun | Jan '10 | |
| 160 | PT. Okamoto Logistics Nusantara | Cibitung - Bekasi |
- Rolling and loading works of spray machine and accessories at PT. Showpla - Installation of Stealing Machine & Accessories at PT. Nihon Plast - Installation of Machine & Accessories at PT. Komatsu Bane Cikampek - Installation of Sewing Machine & Accessories at PT. Nihon Plast Tambun - Installation & Relayout Works for 1 unit former machine at PT. Komoda Indonesia - Relayout Machineries |
Jan '10 Jan '10 Feb '10 May '10 Jul '10 Oct '10 |
|
| 161 | PT. Frina Lestari Nusantara | Sentul - Bogor |
- Installation 1 unit of 200 Tons AIDA Press machine - Installation of Injection Moulding Machine and Accessories - Installation of Elite EH 230 Injection moulding Machine & Accessories - Installation of Shing Tai Iron, SCI-110 Press Machine & Accessories - Installation of Blow Machine - Installation of 60 Tons Press Machine |
Jan '10 Mar '10 May '10 May '10 Jun '10 Jun '10 |
|
| 162 | PT. Arsicon Harza International | Cikupa - Tangerang |
- Trucking & Installation of 8 units AIDA Press Machine at PT. Rinnai Indonesia - Trucking & Installation of 2 units AIDA Press Machine - Trucking & Installation of 9 units press machine, 2 units Feeder Installation, Relayout 4 units machineries at PT. Rinnai Indonesia - Overhaule of 1 unit 500 Tons Kojima press machine at. PT Yutaka Manufacturing - Installation of 3 units Komatsu Press Machine at PT. Mekar Armada Jaya - Trucking & Installation of 7 units AIDA Press Machine at PT. Rinnai Indonesia - Trucking & Installation of 2 units AIDA NC-1-800 - Installation of 1000 Tons AIDA Press Machine at PT. Mekar Armada Jaya |
Jan '10 Mar '10 Jul '10 Jul '10 Aug '10 Oct '10 Nov '10 Dec '10 |
|
| 163 | PT. Murinda Iron Steel | Tanjung Priok - Jakarta | Erection of Equipment at PT. Bimoli | Feb '10 - Apr '10 | |
| 164 | PT. Tri Dharma Wisesa | Pulogadung - Jakarta |
- Relay out of Line Casting - Relay out works of Machining machine - Relay out works of 2 units Machining machine |
Feb '10 Feb '10 Feb '10 |
|
| 165 | PT. Amerta Indah Otsuka |
Pasuruan - Jawa Timur Sukabumi |
- Installation of new line equipment - Gantry Utilization - Overhaul A2 lines of Air Conveyor |
Feb '10 - May '10 Sep '10 Oct '10 |
|
| 166 | PT. Padma Soode Indonesia | Bantargebang - Bekasi |
- Relay out & Installation of new press machine at PT. Padma Soode Indonesia - Installation & Relayout Works of press machine - Relayout & Relocation Works of Machine Phase 2 - Installation & Relayout Works of Machine Phase 3 - Relayout & Installation of Machine ( CNC Mazak & 5 units Feeder ) |
Feb '10 Jul '10 Sep '10 Oct '10 Oct '10 |
|
| 167 | PT. Extrupack | Rawapasung - Bekasi |
- Piping works , Fabrication and Installation of LPG House - Relocation of machineries line VI - Relocation of machineries and accessories - Fabrication & Construction of LPG House - Relayout of Machine & Installation Cable Rack - Relocation of racks - Relocation of 12 units 42 feet container - Modification of Air Piping & Cable Rack - Relocation Panel |
Mar '10 May '10 Aug '10 Oct '10 Oct '10 Dec '10 Dec '10 Dec '10 Dec '10 |
|
| 168 | PT. AIDA Stamping Tech | Sunter - Jakarta |
- Overhaule of 1 unit 1500 Tons AIDA Press Machine at PT. ADM - Unloading & Installation of 1 unit AIDA SMX-II-S2-6000 at PT. Namicoh Cengkareng - Overhaul AIDA Press Machine at PT. ADM |
Mar '10 Apr '10 Oct '10 |
|
| 169 | PT. Cepi Moving | Manyar - Gresik | Repositioning of 100 Tons Compressor at BOC Gases | Mar '10 | |
| 170 | PT. Menara Terus Makmur | Jababeka - Cikarang |
- Overhaule1000 Tons FG-B Jing Duann Press Machine - Erection Press 2 units of Jing Duann Press Machine - Relay out machine area MP - Erection machine Shot Blasting - Relayout Dieshop Machineries at PT. MTM Cikarang - Relayout of 2 units press coining at Heat Treatment - Overhaul of 1 unit 100 Tons ( ram Assy ) Jing Duann FP - Overhaul of 1000 Tons Jing Duann , FG -8 - Installation of 9 units CNC Machine |
Jun '10 Jun '10 Jun'10 Jun '10 Jul '10 Sep '10 Sep '10 Oct '10 Oct '10 |
|
| 171 | PT. Kiyokuni Indonesia | EJIP - Cikarang | Relayout of 1 unit Mori Seiki Centering Machine | Jun '10 | |
| 172 | PT. Nichias Rockwool | Cikampek | Installation of 110 Tons AIDA Press machine at PT. Nichias Rockwool Cikampek | Jul '10 | |
| 173 | PT. Asalta Mandiri Agung | Sentul - Bogor | Rolling & Setting of 1 unit 200 Tons Komatsu Press machine | Sep '10 | |
| 174 | PT. Namicoh Indonesia | EJIP - Cikarang | Unloading & Temporary Storage of 2 units Press Machine | Sep '10 | |
| 175 | PT. Pamindo Tiga T | JIEP - Pulogadung | Installation of 5 units Komatsu press machine , Relayout 2 units Komatsu press machine and removal of 1 unit Komatsu Press Machine | Nov '10 - Jun '11 | |
| 176 | PT. Kiyokuni Indonesia | EJIP - Cikarang | Custom Clearance, Inland Transportation, Offloading, Setting and Leveling of 1 unit 200 Tons AIDA press machine | Nov '10 | |
| 177 | PT. Indopoly Swakarsa Indonesia | Bukit Indah - Cikampek | Unloading, unpacking & positioning metalizer machiner | Dec '10 | |
| 178 | PT. Sarana Pumas Mandiri | Unjani - Bandung | Electrical Works at Laboratorium Unjani Bandung | Jan '11 | |
| 179 | PT. Extrupack | Rawapasung - Bekasi |
- Relocation Machineries at Line 6 - Relocation of Machineries at Line 7 - Relayout Compressor & Dryer |
Jan '11 Mar '11 Apr '11 |
|
| 180 | PT.Citra Anugerah Karya | EJIP - Cikarang | Installation 200 Tons AIDA Press Machine | Jan '11 | |
| 181 | PT. Frina Lestari Nusantara | Sentul - Bogor |
- Installation of 2 units Injection Moulding machine and accessories - Unloading & Temporary Storage of Painting Machine ( 11 Container ) |
Jan '11 Feb '11 |
|
| 182 | PT. Amerta Indah Otsuka | Kejayan - Pasuruan |
- Overhaule of Machineries in 1st Line at PT. Amerta Indah Otsuka Pasuruan - Support to overhaule canning machine - Gantry Utilization for overhaule compressor |
Jan '11 Mar '11 May '11 |
|
| 183 | PT. AIDA Stamping Tech | EJIP - Cikarang |
- Overhaule 300 Tons AIDA Press Machine at PT. Namicon Cikarang - Unloading & Installation of 600 Tons AIDA Press Machine at PT. Namicoh Indonesia |
Jan '11 & Mar '11 May '11 |
|
| 184 | PT. Okamoto Logistics Nusantara | MM2100 - Cibitung |
- Installation of Hi - Frex machine & Accessories at PT. Umeda Kogyo Cibitung - Unloading, Setting, Leveling & Test Running 47 Tons Forming Machine Center with accessories |
Feb '11 Apr '11 |
|
| 185 | PT. Otsuka Indonesia | Lawang - Malang |
- Inland Transportation of Auto Clave Accessories ex. Tanjung Perak - Installation of 1 unit Auto Clave |
Feb '11 Feb '11 |
|
| 186 | PT. Arsicon Harza International | Cikupa - Tangerang |
- Trucking and Installation of 2 units AIDA NC2-2500 and 3 units AIDA NC2-2000(2) a - Trucking and Installation of 2 units AIDA NC1-1500 and 6 units AIDA NC1-1100(2) - Trucking and Installation of 5 units press machine - Trucking and Installation of Lin Chieh press machine - Installation of 2 units Mitsubishi BMGS 1400 Genset - Installation of printing machine at PT. Indokonverta Indah |
Mar '11 Mar '11 Apr '11 Apr '11 Apr '11 May '11 |
|
| 187 | PT. PECGI | Kawasan Gobel - Cibitung |
- Loading & Installation of new machine CR 2477 - Loading & Installation of CR 2032 |
Mar '11 Apr '11 |
|
| 188 | PT. Altech Indonesia | Cicurug - Sukabumi | Dismantling & Packing | Mar '11 | |
| 189 | PT. Inti Pantja Press Industri | Pondok Ungu - Bekasi | Material Handling, Inland Transportation & Installation of AIDA Tandem Presses Machine 1000 x 1 + 600 Tons x 3 ( total 4 units ) | May '11 |
Projects